Winter special: 0% APR financing for 12 months on projects booked by January 31.*See the offer
(331) 250-3726Manhattan, IL. Serving Will, DuPage and Cook counties
Windows Doors and Beyond

We install James Hardie fiber cement and insulated vinyl siding in Orland Park, with our own siding crews. Siding has become one of the biggest parts of our business, with more than 5,800 siding customers served.

Most of Orland Park was built between the 1970s and the 2000s. The older neighborhoods are full of brick ranches, raised ranches and split-levels, and the south and west sides have larger two-story homes from the 1990s onward.

Winter special: 0% APR financing for 12 months on approved credit, for projects booked by January 31, 2027. See the offer

The homes we work on in Orland Park

What a house needs depends mostly on when and how it was built. Here is what we find in Orland Park and how we handle it.

In the brick ranches, raised ranches and split-levels from the 1970s and 1980s, you will find cedar, hardboard or T1-11 panel siding that needs paint every few years and is swelling at the bottom edges. Hardboard in particular does not recover once it takes on water. Replacing it with fiber cement or insulated vinyl ends the paint cycle, and we replace the rotted trim and wrap the fascia at the same time.

On the south and west sides, in the two-story homes from the 1990s and 2000s, builders used thin vinyl on three sides with brick or stone on the front. By now the vinyl is faded, cracked from hail or loose at the corners, and it often cannot be color-matched for repairs. Residing the three vinyl sides in James Hardie or a thicker insulated vinyl is the most common siding job we do on homes of this age.

On the larger custom-home lots, siding is an accent material: gables, dormers, bays and the rear elevation, usually paired with brick or stone. That is where mixed profiles work well, such as lap siding on the main walls with board-and-batten or shingle panels in the gables. We keep the trim details crisp because they are what people see from the street.

On a brick Orland Park home the siding is usually limited to gables, a second-story bump-out and the soffit and fascia. Small areas, but they are the parts that peel and rot first.

Signs your siding is due

  • Boards that are soft, swollen or crumbling at the bottom edge. Water is being absorbed instead of shed.
  • Paint that peels again within a couple of years. Moisture is coming through from behind.
  • Cracks, holes or loose panels. Hail and wind damage lets water reach the sheathing.
  • Warping or waviness along a wall. Often a sign of rot or trapped moisture underneath.
  • Fading so uneven that repairs cannot be matched. At that point patching will always show.

Siding is a rain screen. Once it stops shedding water, the damage moves to the sheathing and framing, which costs far more to fix than the siding itself.

What we install

  • James Hardie fiber cement. Our most-installed siding. The HZ5 product line is made for climates with freezing winters, it does not melt, dent easily or feed woodpeckers, and ColorPlus factory finish means no painting at installation. Available as lap siding, shingle panels and board-and-batten.
  • Insulated vinyl. A rigid foam backing makes the panel stiffer, quieter and warmer than standard vinyl, and it never needs paint. A good fit when budget matters and the walls could use more insulation.
  • LP SmartSide. Engineered wood with a deep grain, lighter than fiber cement, for homeowners who want the look of wood.

Whichever you choose, the job includes removing the old siding, repairing sheathing, a new weather barrier, flashing at every window and door, and new trim. That hidden work is what keeps water out. Compare the materials in James Hardie vs vinyl or try colors on a house in our exterior designer.

How a siding job runs

  1. Consultation and samples. We measure the house, check the walls for soft spots and bring full-size samples so you can hold colors against your brick, roof and trim in daylight.
  2. Tear-off and repair. Old siding comes off down to the sheathing. Anything rotted is replaced and shown to you before we cover it.
  3. Weather barrier and installation. We wrap the house, flash openings, then install siding and trim to the manufacturer's nailing and clearance requirements, which is what keeps the warranty valid.
  4. Finish and cleanup. Caulk, touch-up, gutters back on, a magnet sweep of the yard and a walkthrough with you.

What drives the price

The size and height of the house, the material, how much trim, soffit and fascia is included, and how much repair we find under the old siding. Two-story walls and many corners or gables add labor. Your estimate is written, itemized and good for 30 days, and 0% financing is available on approved credit. For real numbers, see our siding cost guide.

What Orland Park homeowners can hold us to

  • Our own specialized crews. The people who install siding for us do that work every day.
  • Written, itemized estimates. You see what each part costs, and the price is good for 30 days.
  • No pressure. We explain the options and let you decide. Nobody will sit at your table until you sign.
  • Hidden damage shown first. If we open something up and find rot, you see it and approve the repair before we continue.
  • Clean job sites. We clean up every day and haul away everything we remove.

We have been doing this for 20+ years from Manhattan, Illinois, and we are rated 5 stars on Google. Read more about how we work.

Permits and scheduling in Orland Park

Permit rules are set by the Village of Orland Park, and they differ from town to town. We check what your project needs before we order, pull the permit when one is required and build the inspection into the schedule. If your home is in a designated historic district, exterior changes may also need design review, and we can provide the product details the reviewers ask for.

Siding can go up in most weather. Vinyl gets brittle in deep cold, so we schedule vinyl jobs around the coldest weeks; fiber cement can be installed through the winter.

Siding Installation questions from Orland Park homeowners

How long does a siding job take in Orland Park? +
Most homes take one to two weeks, depending on size, height and how much repair is needed under the old siding.
Is James Hardie worth the extra cost over vinyl? +
For many homeowners, yes. It resists hail, heat and pests better, holds paint longer and adds more resale value. Insulated vinyl costs less and is still a solid, low-maintenance choice. We price both.
Do you remove the old siding? +
Yes. We tear off to the sheathing so we can fix hidden damage and install a proper weather barrier. Covering over old siding hides problems and can void the new product's warranty.
Can you side just part of the house? +
Yes. Residing the three non-brick sides, or only the gables and a bump-out, is common. We help you choose a color that works with the brick or stone that stays.
Will new siding lower my energy bills? +
Insulated vinyl and a new, taped weather barrier both reduce drafts. Siding alone is not insulation, but closing up a leaky wall is noticeable in winter.
Which parts of Orland Park do you work in? +
All of it, including Old Orland, the brick-ranch neighborhoods in the center of the village and the newer south and west sides. We are based in Manhattan, Illinois and work across Will, DuPage and Cook counties.

More for Orland Park homeowners

See everything we do in Orland Park, read more about our siding service, or request a free consultation. We also do this work in Tinley Park, Mokena, Homer Glen.

Get a free consultation and a written estimate

We measure, show you options at more than one price, and leave the numbers with you in writing. Nobody asks you to sign that night.

Call (331) 250-3726

Winter special: 0% APR for 12 months*

Free estimate

*On approved credit, for projects booked by January 31. We call or text back to set a time. By sending this form you agree to be contacted about your request. Consent is not a condition of purchase.

CallFree consultation